Royal Albert Hall

Mechanical Fit Out

Project Outcome

Project: Royal Albert Hall – Grand Tier East & Second Tier East WC Refurbishments.
Location: Northern Edge of South Kensington, London.
Sector: Entertainment.
Project Duration: 3 months
Client: Overbury Plc
Completion: March 2025

Overview:

Envirotech Services Limited was honoured to have completed the complete renovation of both the Grand Tier and Second Tier Male and Female toilets on the east side of this world’s renown 154-year-old concert hall.

This project included the total strip out of the existing mechanical services back to riser locations and the complete renovation of the facilities bringing a fresh contemporary look yet retaining a Victorian feel reminiscent of the era the hall was constructed.

Works involved:

Ductwork/Ventilation:

  • The installation of new extract ductwork sized appropriately for optimum airflow/velocity.
  • The installation of new ventilation extract air valves strategically positioned and installed for both functionality and aesthetics.

Public Health:

  • The installation of new hot and cold-water services along with sanitaryware complete with sensor taps and automatic flushing systems.

Above Ground Drainage:

  • The installation of new cast iron and PVCu drainage services

Leak Detection:

  • Deployment of EcoLeak™ Eco-6 Leak Detection System complete with water-sensing cables and water-sensing probes.

Building Management System (BMS):

  • Configuration of existing BMS infrastructure to capture new leak detection systems. The update/inclusion of BMS headend graphics along with alarm management.

 

A huge thank you to all involved in delivering this project in this remarkable historic building.