Green Energy Hub

Mechanical Fit Out

Project Outcome

  • New VAV Supply Ventilation System: Implemented a brand-new Variable Air Volume (VAV) supply ventilation system, optimizing airflow and energy efficiency.
  • Specialized Medical & Lab Services Installation: Successfully installed comprehensive medical gas and lab water services, alongside a new fume extract system and a high-efficiency VRV (Variable Refrigerant Volume) air conditioning system.
  • Lab Water Services Upgrade: Completed an upgrade to existing lab water services, ensuring reliable and high-quality water supply for laboratory operations.