Berkeley Square House

2024/2025

Cat B at BSH

  1. ๐—–๐—ฎ๐˜ ๐—• ๐—ณ๐—ถ๐˜ ๐—ผ๐˜‚๐˜ at ๐—•๐—ฆ๐—›โ  โ  โ  โ 
  2. ๐—ก๐—ฒ๐˜„ ๐—™๐—ฎ๐—ป ๐—–๐—ผ๐—ถ๐—น ๐—จ๐—ป๐—ถ๐˜๐˜€ (๐—™๐—–๐—จ)โ  โ  โ 
  3. ๐—ก๐—ฒ๐˜„ ๐—ฉ๐—ฒ๐—ป๐˜๐—ถ๐—น๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐—ฆ๐˜†๐˜€๐˜๐—ฒ๐—บ๐˜€โ  โ  โ 
  4. ๐—Ÿ๐—ผ๐˜„-๐—ง๐—ฒ๐—บ๐—ฝ๐—ฒ๐—ฟ๐—ฎ๐˜๐˜‚๐—ฟ๐—ฒ ๐—›๐—ผ๐˜ ๐—ช๐—ฎ๐˜๐—ฒ๐—ฟ (๐—Ÿ๐—ง๐—›๐—ช) ๐—ฎ๐—ป๐—ฑ ๐—–๐—ต๐—ถ๐—น๐—น๐—ฒ๐—ฑ ๐—ช๐—ฎ๐˜๐—ฒ๐—ฟ (๐—–๐—›๐—ช) ๐—ฆ๐—ฒ๐—ฟ๐˜ƒ๐—ถ๐—ฐ๐—ฒ๐˜€ โ  โ  โ 
  5. ๐—ก๐—ฒ๐˜„ ๐—ฃ๐˜‚๐—ฏ๐—น๐—ถ๐—ฐ ๐—›๐—ฒ๐—ฎ๐—น๐˜๐—ต ๐—ฆ๐—ฒ๐—ฟ๐˜ƒ๐—ถ๐—ฐ๐—ฒ๐˜€โ  โ  โ 

๐—ช๐—ต๐—ฎ๐˜โ€™๐˜€ ๐—ฏ๐—ฒ๐—ฒ๐—ป ๐—ฐ๐—ผ๐—บ๐—ฝ๐—น๐—ฒ๐˜๐—ฒ๐—ฑ ๐—ถ๐—ป ๐˜๐—ต๐—ฒ ๐—น๐—ฎ๐˜€๐˜ ๐Ÿฏ ๐—บ๐—ผ๐—ป๐˜๐—ต๐˜€?โ 

  • ๐—™๐—ถ๐—ป๐—ฎ๐—น ๐—ฎ๐—ฟ๐—ฐ๐—ต๐—ถ๐˜๐—ฒ๐—ฐ๐˜๐˜‚๐—ฟ๐—ฎ๐—น ๐—ณ๐—ถ๐—ป๐—ถ๐˜€๐—ต๐—ฒ๐˜€ โ€“ bringing the clientโ€™s vision to life with precision detailing.โ 
  • ๐—–๐—ผ๐—บ๐—บ๐—ถ๐˜€๐˜€๐—ถ๐—ผ๐—ป๐—ถ๐—ป๐—ด ๐—ผ๐—ณ ๐—บ๐—ฒ๐—ฐ๐—ต๐—ฎ๐—ป๐—ถ๐—ฐ๐—ฎ๐—น ๐—ฎ๐—ป๐—ฑ ๐—ฒ๐—น๐—ฒ๐—ฐ๐˜๐—ฟ๐—ถ๐—ฐ๐—ฎ๐—น ๐˜€๐˜†๐˜€๐˜๐—ฒ๐—บ๐˜€ โ€“ ensuring seamless operation.โ 
  • ๐—œ๐—ป๐˜๐—ฒ๐—ด๐—ฟ๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐—ผ๐—ณ ๐—ป๐—ฒ๐˜„ ๐—™๐—ฎ๐—ป ๐—–๐—ผ๐—ถ๐—น ๐—จ๐—ป๐—ถ๐˜๐˜€ (๐—™๐—–๐—จ๐˜€) โ€“ optimizing temperature control and efficiency.โ 
  • ๐—™๐—ถ๐—ป๐—ฎ๐—น ๐˜ƒ๐—ฒ๐—ป๐˜๐—ถ๐—น๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐—ฎ๐—ป๐—ฑ ๐—ฎ๐—ถ๐—ฟ ๐—ฑ๐—ถ๐˜€๐˜๐—ฟ๐—ถ๐—ฏ๐˜‚๐˜๐—ถ๐—ผ๐—ป ๐—ฎ๐—ฑ๐—ท๐˜‚๐˜€๐˜๐—บ๐—ฒ๐—ป๐˜๐˜€ โ€“ enhancing airflow and comfort.โ 
  • ๐—ง๐—ฒ๐˜€๐˜๐—ถ๐—ป๐—ด & ๐—ต๐—ฎ๐—ป๐—ฑ๐—ผ๐˜ƒ๐—ฒ๐—ฟ โ€“ delivering a fully functional workspace ready for use.โ 

multiple projects in this folder, scrollย downย ๐Ÿ‘‡

Level 1

Level 7.1 (two rooms)

Scope of work includes the relocation of one existing FCU, installation of two new Ability FCUs, and the addition of two new Mitsubishi split systems dedicated to the comms room. The project also involves the installation of new room controllers, a new kitchen extract fan, and the provision of new water and waste supplies to service two new tea points

Office Fit Out